2013-06-24 - 7786 - Service Request - ATP check inventory availability. #ProductionBreakFix #US #MRPPIR
2013-06-24 - 7786 - Service Request - ATP check inventory availability
Problem Summary
ATP check inventory availability
Admin Info
Purpose
|
ATP check inventory availability
|
Requested by
|
John Fridmann
|
Issue Date
|
06-21-2013
|
Resolved by
|
Laxman
|
Resolved Date
|
06-21-2013
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
ATP check inventory availability
Solution Analysis and Recommendations
(Include Screen Shots if required)
During ATP simulation ATP will be calculated as below.
For In-house materials – Calculation based on RLT specified in the material master if RLT is not maintained based on In-House production time + GR time.
For External material - Calculation based on Planned delivery time specified in the material master.
Resolution
Informed client the functionality involved in the T-code
Release Information
Provide link here to Release Notes if Technical Objects were changed
ATP check inventory availability